DM instant load debug log

2026-11-11T06:45Z — Step 1

Necessary/useful instructions

  • AGENTS.md "UI copy" (final on first paint): shaped Option B's risk about async cache reads; retain.

  • private_message_history_sync_storage_findings.md "Plaintext ... browser memory only": surfaced a prior decision the recommendation must amend; retain the habit of reading prior findings.

  • step1_solution_assessment.md Structure (Original Query, options, recommendation): kept the comparison short; retain.

Redundant/unnecessary instructions

  • RAILSPIKE.md Experimental Effort Estimation: long relative to a one-page Step 1; recording intake and handoff values that are equal after inspection added bookkeeping with little signal. Suggest consolidating intake and Step 1 snapshots when both follow inspection.

Inapplicable instructions

  • Step 1 "Next" /new or /clear reminder: conversation had prior discussion, so it applies; no inapplicable items otherwise.

Uncertain assessments

  • R1 reference hashes were not re-verified this session; recorded as such rather than claimed.

2026-11-11T07:15Z — Step 2

Necessary/useful instructions

  • step2_feature_description.md "Known user or environment": forced naming iPhone Safari evidence, which desktop browser runs would otherwise have stood in for; retain.

  • implementation_standards.md shared component inventory: surfaced clearBrowserIdentity and outbox_storage.js as extension points; retain.

Redundant/unnecessary instructions

  • Effort-study snapshot repeated at Step 2 with an unchanged value; low signal when scope did not change. Suggest allowing "reaffirmed" as a ledger-only line.

Inapplicable instructions

  • Documentation-only scope fields: work is an application change.

Uncertain assessments

  • Whether "Release condition: flag off by default" fits the guardrail that a feature is a normal-flow vertical slice; treated as satisfied because the flag-on path is a complete user flow.

2026-11-11T12:30Z — Step 3

Necessary/useful instructions

  • step3_development_plan_do.md "include a stage that replays each reported failure": produced Stage 6 for iPhone Safari; retain.

  • step3_development_plan_do.md "Prefix usability, data, or rollback risks High risk": made the trust and first-paint risks stand out; retain.

Redundant/unnecessary instructions

  • Plan ≤1 page plus per-stage seven-field template: six stages fill well over a page; the two constraints conflict. Suggest allowing the template to exceed one page or a compact table form.

Inapplicable instructions

  • Database changes documented conceptually: no server schema change.

Uncertain assessments

  • Stage estimates happen to sum to the cycle estimate (0.70); the cycle value was judged independently and kept, not derived.

2026-11-11T14:30Z — Step 4

Necessary/useful instructions

  • step4_implementation_before.md Planning Docs Commit Gate: kept plans and implementation separable in history; retain.

  • implementation_standards.md "Replay each reported failure ... a pass elsewhere does not establish recovery": kept Stage 6 honestly pending instead of counting desktop Chromium; retain.

  • AGENTS.md "identify reproduced baseline failures": comparison runs on a clean origin/main worktree separated three pre-existing messaging-suite failures from this work; retain.

Redundant/unnecessary instructions

  • step4_implementation_after.md commit-count rule (1 + number_of_stages): a maintainer-only acceptance stage can't have its own commit before handoff, so the count is necessarily one short while it is pending. Suggest exempting pending acceptance-only stages.

Inapplicable instructions

  • Documentation-only verification items: application change.

  • Database migration checks: no server schema change.

Uncertain assessments

  • Whether the Step 4 summary should have been created before any Stage 1 edit; it was created after the planning commit but while Stage 1 changes were in the working tree. Recorded in the summary's study snapshot.